    crew: R. Michaels, T. Averett, N. Savvinov
    We are taking production data, pol. He3, transverse (270 degrees).
    Beam energy 3.463 GeV, P = 1.6 GeV/c angle 18.6 degrees each arm.
    Start shift with a HARP scan run 1383 (there was no CODA run).
    11:00-1:30 beam off for RF work
    After 1:30 there are many beam trips


    Runs...............Good electrons.....Total good e-

    2657/21657.......220k/210k............430k
    2658/21658.......427k/460k...........1.35M
    2659/21659.......427k/497k...........2.24M
    2660/21660.......426k/452k...........3.12M
    2661/21661.........49k/48k.............3.21M
    2662/21662.......427k/437k...........4.08M
    2663/21663.......424k/412k...........4.91M
    2664/21664 in progress

    16:45 began EPR/NMR