• Main INDEX
  • Monthly INDEX
  • PREV
  • NEXT

    User name R. Michaels

    Log entry time 16:08:47 on August 8,2001

    Entry number 69962

    keyword=day shift summary

    Crew: R. Michaels, N. Liyanage, V. Savvinov, and
    the ever-present W. Korsch.

    Comments
    ===========================================
    08:00 Continuation of kinematics E=3.46, P=1.6 GeV/c, theta=18.6
    beam halfwave in, target halfwave out, transverse pol (270 degrees).
    08:25 Beam delivery interrupted to replace a trim card for arc 2.
    08:50 Beam returns.
    10:55 Finished with 270 degree target angle running. Switch to 90
    degrees. Put target halfwave IN. Also did NMR/EPR (halog 69927).
    14:13 Roc15 hung up. Run 21696 failed to end. Reboot DAQ. Lost 5 minutes.
    15:00 Stop to do NMR/EPR. (halog 69958)
    15:25 Resume data taking.

    Run Summary
    ============================================
    Run.................................Start/Stop
    2689/21689/1820............07:48/08:25....beam taken away
    2690/21690/1821............08:51/09:39
    2691/21691/1822............09:41/10:29
    2692/21692/1823............10:30/10:54
    ---- change to 90 degr. target angle ----
    2693/21693/1824............11:24/12:03
    2694/21694/1825............12:04/12:52
    2695/21695/1826............12:52/13:32
    2696/21696/1827............13:33/14:13
    2697/21697/1828............14:19/14:58
    2698/21698/1829............15:25/16:07