Main INDEX
Monthly INDEX
PREV
NEXT
User name jpchen
Log entry time 16:10:21 on August13,2001
Entry number 70714
keyword=Target test: loss/temperature studies
Target test during MD period:
After beam off this morning at 4:30 am, Kevin did EPR loss study measurement
and NMR loss study measurements. Then temperature study at different target
positions with EPR.
During day shift, I did rotation loss study measurments: all with lasers off.
NMR (always at 0 degree), then rotating to 270 and back to 0, NMR;
then 270 again back to 0, NMR; to 90, back 0, NMR; to 90 again, back to 0, NMR;
to 180, back to 0, NMR; to 180 again, back to 0, NMR; to 90 back to 0 5 times, NMR. Now three lasers on to pump back for 2 hours. Next shift will do a base
line measurement: after 2 hours pumping, turn off lasers, wait for 10 minutes,
start NMR, then do NMRs at the same time interval as were done during rotation
loss study.