1600 | 1700 | 1800 | 1900 | 2000 | 2100 | 2200 | 2300 | Total Time | |
---|---|---|---|---|---|---|---|---|---|
Acceptable Beam in Use | 31.2 | 56.1 | 0 | 21 | 8.5 | 39.3 | 47.9 | 44.7 | 4.145 |
Beam Available but Not in Use | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
Beam Not Available or Unacceptable | 28.8 | 3.9 | 60 | 39 | 51.5 | 20.7 | 12.1 | 15.3 | 3.855 |
Accelerator Con- figuration Chage | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
Experiment Ready | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 8 |
Planned Config- uration Change | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
Unplanned Experiment Down | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
Hall not ready reasons | |||||||||
Target | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
HRSe | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
HRSh | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
Data Ac | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
Other | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
Comments: 4 o'clock we asked the beam to be properly positioned (about 12 min at 1 uA. Beam available but unacceptable) 6:10: Target polarimetry. About 48% polarization 6:32: beam back. 6:40. Beam down for Hall B tune. 6:58 beam back. 7:00 beam down (Hall B tune). 7:05 beam is really down (even for Hall B) because of a FSD. 7:35 beam is back. 20:10 MCC is having Beam Loss Monitor alarm: Beam down. 21:13 Beam back 23:18 We put the bean 1/2 wave plate in: Set up target out, Beam in. Start pita slope callibration.
Data Entry by: A. Deur