Main INDEX
Monthly INDEX
PREV
NEXT
User name J. Roche
Log entry time 08:04:38 on August17,2001
Entry number 70958
keyword=shift summary
target : 1/2wp out, 0 degres
beam : 1/2 wp in
* started with the PITA calibration (see entry 70907)
* 1:20 : NMR/EPR measurement (47.5%,46.5%) (see entry 70911)
* lost beam at 2:00 (runs 21862/2862 junk : no beam)
* recover beam at 3:05
* 6:30 : NMR/EPR measurement.
A parrallele
************
ok
run 61,64,65,66,67,68 -> 0.954 M e- in left; 0.888 M e- in right
************
bad beam position
run 63 -> 0.155 M e- in left; 0.147 M e- in right
************