• Main INDEX
  • Monthly INDEX
  • PREV
  • NEXT

    User name J. Roche

    Log entry time 08:04:38 on August17,2001

    Entry number 70958

    keyword=shift summary

    target : 1/2wp out, 0 degres
    beam : 1/2 wp in

    * started with the PITA calibration (see entry 70907)
    * 1:20 : NMR/EPR measurement (47.5%,46.5%) (see entry 70911)
    * lost beam at 2:00 (runs 21862/2862 junk : no beam)
    * recover beam at 3:05
    * 6:30 : NMR/EPR measurement.

    A parrallele
    ************
    ok
    run 61,64,65,66,67,68 -> 0.954 M e- in left; 0.888 M e- in right
    ************
    bad beam position
    run 63 -> 0.155 M e- in left; 0.147 M e- in right
    ************