    User name adaq

    Log entry time 00:01:29 on August 19, 2001

    Entry number 71233

    keyword=Beam Time Accounting
    Hall A

    8/18/2001 1600-2400
    Experiment #: e97103
    Shift Leader: A. Deur
    Shift Workers: A. Tobias, J. Zhou

    16001700180019002000210022002300Total Time
    Acceptable Beam
    in Use
    50.1 50.8 33.5 20.1 0 42.4 54.3 51.7 5.04833333333333
    Beam Available
    but Not in Use
    0 0 23 0 0 0 0 0 0.383333333333333
    Beam Not Available
    or Unacceptable
    9.9 9.2 3.5 39.9 1 17.6 5.7 8.3 2.56833333333333
    Accelerator Con-
    figuration Chage
    0 0 0 0 0 0 0 0 0
    Experiment
    Ready
    1 1 1 1 1 1 1 1 8
    Planned Config-
    uration Change
    0 0 0 0 0 0 0 0 0
    Unplanned
    Experiment Down
    0 0 0 0 0 0 0 00
    Hall not
    ready reasons
    Target 0 0 0 0 0 0 0 0 0
    HRSe 0 0 0 0 0 0 0 0 0
    HRSh 0 0 0 0 0 0 0 0 0
    Data Ac 0 0 0 0 0 0 0 0 0
    Other 0 0 0 0 0 0 0 0 0

    Comments: 6:37: asked for the beam off in order to perform nmr/epr NMR 43.2% / 43.0 EPR 7:10 Beam back. 7:35 Beam down because MCC need to tune for Hall B. 9:04 Beam back. 9:14 Beam down because Hall B is doing a Harp Scan 9:26 Beam back

    Data Entry by: A. Deur