    8/22 swing shift: J. P. Chen, B. Reitz, P. Djawotho.
    16:00-18:30 Beam off, cryo group hunting for heat leak and then beam tuning.
    18:30-18:50 EPR=44.7%, NMR=44.2%.
    18:55 beam off to tune hall B
    19:25 beam back, 8 uA, Resume data taking.
    19:35 back to 10 uA.
    Kin 2, E=4.6GeV, 18.6 degree, 1.99 GeV. Beam Half waveplate out,
    target at 270 degree, half waveplate out.
    19:25-23:50 Smooth data taking.
    23:50-0:10 NMR=41.92%/EPR=42.9%

    Total before this shift for this configuration is 6.125M
    L-run# good e R-run# good e Grand Total
    Run3039/31039 short/junk.
    3040 181K 31040 169K 6.475M
    3041 212K 31041 198K 6.885M
    3042 197K 31042 183K 7.265M
    3043 202K 31043 189K 7.656M
    3044 222K 31044 208K 8.158M
    3045/31045 to be analyzed by next shift.