    Log entry time 00:31:51 on August 23, 2001

    Entry number 71915

    keyword=Beam Time Accounting
    Hall A

    8/22/2001 1600-2400
    Experiment #: e97103
    Shift Leader: J. P. Chen
    Shift Workers: B. Reitz, P. Djawotho

    16001700180019002000210022002300Total Time
    Acceptable Beam
    in Use
    0 0 0 35 56.3 56.8 55 45 4.135
    Beam Available
    but Not in Use
    0 0 0.2 0 0 0 0 10 0.366666666666667
    Beam Not Available
    or Unacceptable
    1 1 0.8 25 3.7 3.2 5 5 3.49833333333333
    Accelerator Con-
    figuration Chage
    0 0 0 0 0 0 0 0 0
    Experiment
    Ready
    1 1 0.8 1 1 1 1 50 7.63333333333333
    Planned Config-
    uration Change
    0 0 0.2 0 0 0 0 10 0.366666666666667
    Unplanned
    Experiment Down
    0 0 0 0 0 0 0 00
    Hall not
    ready reasons
    Target 0 0 0 0 0 0 0 0 0
    HRSe 0 0 0 0 0 0 0 0 0
    HRSh 0 0 0 0 0 0 0 0 0
    Data Ac 0 0 0 0 0 0 0 0 0
    Other 0 0 0 0 0 0 0 0 0

    Comments: Shift starts with beam off, cryo hunting for heat leak. Then beam tuning. 18:30 beam in hall. EPR/NMR. 18:55 beam tuning for Hall B. 19:25 beam back, resume data taking for kin2, out/270. Smooth running to 23:50. Then NMR(41.92%)/EPR=42.9%.

    Data Entry by: J. P. Chen