Main INDEX
Monthly INDEX
PREV
NEXT
User name A. Vacheret
Log entry time 07:40:44 on August26,2001
Entry number 72550
keyword=Shift Summary
We finished to take data at 270 deg :
RUN 3136/31136----372K/329K----4.983/4.443----9.426
RUN 3137/31137----401K/355K----5.384/4.798----10.182
12:30 We finished to took data at 270 deg Beam HWP OUT.
12:40 NMR/EPR 40.2/39.4%
We moved the holding field to 90 deg, put the target HWP to IN position.
1:10 We asked for beam
RUN 3138/31138----376K/343K----0.376/0.343----0.719
RUN 3139/31139----372K/348K----0.748/0.691----1.439
RUN 3140/31140----367K/331K----1.115/1.022----2.137
RUN 3141/31141----382K/336K----1.497/1.358----2.855
4:20 we stop taking data at 90 deg.
Moved to BeO target and steer (5 uA) beam to (0,0) BPMA and B.
4:35 moved to reference cell, asked for 10 uA beam.
taking 20 mn of data, everything is fine with the steering.
5:05 We filled the reference cell with nitrogen.
5:10 Beam is back, taking 20 mn data.
5:30 We stopped taking data and ramping down the left spectrometer.
5:45 Ed Folts came.
6:00 We Made a Controlled access to change the polarity of the left spectrometer.
6:40 We ramped the magnets.
6:40 NMR/EPR
6:45 MCC told us that the slit at the injector is broken. estimation time to recovery is 2 hours or more....
7:35 The dipole of the left spectrometer is quite "lazy" to reach the value of 2.29 GeV/c.
Let the next shift taking care of the situation.