As of 08:00, switching to kinematics #4 is in progress. Waiting for beam.
Run# Start/Stop Comments, events Left/Right/Total (cumulative)
-------------------------------------------------------------------------------
09:04 Left at +2.630 GeV/c, Right at -2.630 GeV/c ready
10:00 Stuck-slit problem in the injector fixed
13:00 CW beam ready for delivery
3147/31147 13:40 Run for harp scan (harp run #1392)
13:40/14:50 Redoing the beam optics
14:30 Target polarisation: 45.3 % (NMR) 45.1% (EPR)
14:50 Harp run #1393: beam spreads are still around 70 um
16:00 Waiting for MCC to make beam spreads > 100 um
-------------------------------------------------------------------------------