    User name adaq

    Log entry time 16:02:22 on August 27, 2001

    Entry number 72711

    keyword=Beam Time Accounting
    Hall A

    8/27/2001 0800-1600
    Experiment #: e97103
    Shift Leader: J. P. Chen
    Shift Workers: R. Roche, R. Michaels

    08000900100011001200130014001500Total Time
    Acceptable Beam
    in Use
    0 0 30 30 16.8 54.1 50.9 56.3 3.96833333333333
    Beam Available
    but Not in Use
    0 0 10 10 0 0 0 0 0.333333333333333
    Beam Not Available
    or Unacceptable
    1 1 0 0 10 5.9 9.1 3.7 2.47833333333333
    Accelerator Con-
    figuration Chage
    0 0 20 20 33.2 0 0 0 1.22
    Experiment
    Ready
    1 1 50 50 1 1 1 1 7.66666666666667
    Planned Config-
    uration Change
    0 0 10 10 0 0 0 0 0.333333333333333
    Unplanned
    Experiment Down
    0 0 0 0 0 0 0 00
    Hall not
    ready reasons
    Target 0 0 0 10 0 0 0 0 0.166666666666667
    HRSe 0 0 0 0 0 0 0 0 0
    HRSh 0 0 0 0 0 0 0 0 0
    Data Ac 0 0 0 0 0 0 0 0 0
    Other 0 0 10 0 0 0 0 0 0.166666666666667

    Comments: 8:00-10:00 Beam down due to Acc magnet problem. 10:00-11:40 Moller 11:30-11:50 EPR/NMR=46.2/46.8% 11:40-12:20 Beam change from Moller tune to normal tune. 12:20-12:45 Beam spot check with OTR and beam tuning. 12:45-16:00 Smooth data taking at kin 3 beam half waveplate out, target at 0 degree.

    Data Entry by: J. P. Chen