1600 | 1700 | 1800 | 1900 | 2000 | 2100 | 2200 | 2300 | Total Time | |
---|---|---|---|---|---|---|---|---|---|
Acceptable Beam in Use | 20 | 45 | 45 | 53 | 57 | 37 | 43 | 35 | 5.58333333333333 |
Beam Available but Not in Use | 33 | 0 | 0 | 0 | 0 | 20 | 5 | 0 | 0.966666666666667 |
Beam Not Available or Unacceptable | 7 | 15 | 15 | 7 | 3 | 3 | 12 | 25 | 1.45 |
Accelerator Con- figuration Chage | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
Experiment Ready | 27 | 1 | 1 | 1 | 1 | 40 | 55 | 1 | 7.03333333333333 |
Planned Config- uration Change | 33 | 0 | 0 | 0 | 0 | 20 | 5 | 0 | 0.966666666666667 |
Unplanned Experiment Down | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
Hall not ready reasons | |||||||||
Target | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
HRSe | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
HRSh | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
Data Ac | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
Other | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
Comments: Continued kin. #4 with beam IN, target OUT (0 deg). At ~5pm switched to 270 deg. Tg polarisation before switch 45.6% (NMR), 46.2% (EPR). After 5 hours of running at 270 deg, 43.7% (NMR), 43.4% (EPR). Smooth data taking all evening, the only interruption was 11pm-11:30pm for QE measurement.
Data Entry by: Simon Sirca