• Main INDEX
  • Monthly INDEX
  • PREV
  • NEXT

    User name S. Sirca

    Log entry time 23:58:38 on August28,2001

    Entry number 72912

    keyword=Summary of evening shift



    Continuing kinematics #4, beam IN, target IN (90 deg) with run 3195/31195
    inherited from the day shift.

    Run# Start/Stop Comments, events Left/Right/Total (cumulative)
    -------------------------------------------------------------------------------
    3195/31195 15:23/16:18 OK, 279k/251k/1083k
    16:18 Beam off for target polarisation measurement
    16:18/16:46 Tg polarisation: 40.9% (NMR), 41.8% (EPR)
    16:46 Beam is back
    3196/31196 16:47/16:50 Junk run to check raster
    3197/31197 16:55/17:48 OK, 284k/253k/1620k
    3198/31198 17:51/18:44 OK, 299k/267k/2186k
    3199/31199 18:46/19:40 OK, 287k/255k/2728k
    3200/31200 19:41/20:37 OK, 284k/256k/3268k
    3201/31201 20:39/21:32 OK, 262k/235k/3765k
    3202/31202 21:35/22:29 OK, 280k/251k/4290k
    22:30 Beam off for target polarisation measurement
    22:30/23:05 Tg polarisation: 40.1% (NMR), 41.3% (EPR)
    3203/31203 Pedestal runs
    3204/31204 Pedestal runs
    23:05 Beam is back
    3205/31205 Junk run to check raster, beam a bit unstable
    3206/31206 23:20/----> Passed on to night shift
    -------------------------------------------------------------------------------