• Main INDEX
  • Monthly INDEX
  • PREV
  • NEXT

    User name adaq

    Log entry time 00:00:24 on August 29, 2001

    Entry number 72913

    keyword=Beam Time Accounting
    Hall A

    8/28/2001 1600-2400
    Experiment #: e97103
    Shift Leader: Simon Sirca
    Shift Workers: Xiaofeng Zhu, Keith Griffioen

    16001700180019002000210022002300Total Time
    Acceptable Beam
    in Use
    30 52 56 53 55 51 32 45 6.23333333333333
    Beam Available
    but Not in Use
    28 0 0 0 0 0 25 0 0.883333333333333
    Beam Not Available
    or Unacceptable
    2 8 4 7 5 9 3 15 0.883333333333333
    Accelerator Con-
    figuration Chage
    0 0 0 0 0 0 0 0 0
    Experiment
    Ready
    32 1 1 1 1 1 35 1 7.11666666666667
    Planned Config-
    uration Change
    28 0 0 0 0 0 25 0 0.883333333333333
    Unplanned
    Experiment Down
    0 0 0 0 0 0 0 00
    Hall not
    ready reasons
    Target 0 0 0 0 0 0 0 0 0
    HRSe 0 0 0 0 0 0 0 0 0
    HRSh 0 0 0 0 0 0 0 0 0
    Data Ac 0 0 0 0 0 0 0 0 0
    Other 0 0 0 0 0 0 0 0 0

    Comments: Continuing with kinematics #4, beam IN, target IN (90 deg). Target polarisation measurements at ~16:00 (40.9% NMR, 41.8% EPR) and ~23:00 (40.1% NMR, 41.3% EPR) and pedestal runs at ~22:30. Smooth data taking all along with relatively stable 10 muA beam.

    Data Entry by: Simon Sirca