keyword=Shapiro removed and in EEl target lab now.
40 cm pol. He3 cell Shapiro was removed (by Kevin and me). The
7-foil 12C target was taken off and left in the hall. The BeO foil
was broken when I tried to taken it off. Will need to use a new BeO
foil. Kevin brought the cell and target ladder to the EEL target lab where the RADCON had a set-up so that the target can be worked on (will need to get
teh RTDs off to be reused).
Quick inspection of the target cell and ladder: all seems pretty good.
The target cell is dark (brown), but the pumping cell is much better.
The reference cell is also brown but not as dark as the target cell.