• Main INDEX
  • Monthly INDEX
  • PREV
  • NEXT

    User name jpchen

    Log entry time 16:58:45 on August31,2001

    Entry number 73269

    keyword=cooling flow; oven/heater; laser hut AC/air flow

    Cooling jet was turned off this morning around 10:45 am (Kevin).
    Scot told me thatthe flow rate was not 26 l/min, instead it was 26%
    of the full scale (250 l/m), or 65 l/min.

    Oven/heater was initially turned down while the cell is in pick-up
    position and it was found that the cell shifted towards and nearly touch
    the pick-up coil. So itw as heated up again before moved up. Then
    heater turned off and the cell/ladder was removed.
    Air for heater/oven turned off.

    Laser hut AC and air flow turned off (for water calibration). Should be turned
    on as soon as water calibration is on.