User name jpchen
Log entry time 23:52:15 on September 1,2001
Entry number 73275
keyword=Virginia One installed
Kevin finished water calibration by afternoon on 9/1. We installed a new 40 cm
polarized he3 cell, VirginiaOne, in the evening of 9/1. BeO target was replaced.
7-foil 12C put back in. A new target ladder was used (except the bottom piece).
Did not change reference cell. Kevin replace one oven window (the one for transverse
laser). The oven was heated up. Target moved up and down fine (though very
tight on the beam left when reference cell passing through the pickup coil).