• Main INDEX
  • Monthly INDEX
  • PREV
  • NEXT

    User name adaq

    Log entry time 00:02:43 on September 6, 2001

    Entry number 73541

    keyword=Beam Time Accounting
    Hall A

    9/5/2001 1600-2400
    Experiment #: e97103
    Shift Leader: J.P.Chen
    Shift Workers: Charles Perdrisat, Cornel Butuceanu

    16001700180019002000210022002300Total Time
    Acceptable Beam
    in Use
    20 40 36 24.6 31 52.8 42.9 47.8 4.91833333333333
    Beam Available
    but Not in Use
    20 0 15 0 20 0 10 5 1.16666666666667
    Beam Not Available
    or Unacceptable
    20 20 9 35.4 9 7.2 7.1 7.2 1.915
    Accelerator Con-
    figuration Chage
    0 0 0 0 0 0 0 0 0
    Experiment
    Ready
    40 1 45 1 40 1 50 55 6.83333333333333
    Planned Config-
    uration Change
    20 0 0 0 0 0 10 5 0.583333333333333
    Unplanned
    Experiment Down
    0 0 15 0 20 0 0 00.583333333333333
    Hall not
    ready reasons
    Target 20 0 0 0 0 0 10 5 0.583333333333333
    HRSe 0 0 0 0 20 0 0 0 0.333333333333333
    HRSh 0 0 0 0 0 0 0 0 0
    Data Ac 0 0 15 0 0 0 0 0 0.25
    Other 0 0 0 0 0 0 0 0 0

    Comments: 16:15 beam back. spot/raster/postion check. 16:20-16:40 NMR?EPR=41.7/40.4%. Production in kin5 out/0degree whenever there is beam and not doing other special runs. Special runs: EMPTY cell (17:15-17:35), N2 (18:45-19:20). Hall C charge asymmetry test (18:40-19:40). Coda crash (ROC15 and ROC14) 18:21-18:45. Left dipole power trip/recovering 19:55-20:45. Completed kin5 OUT/0degree (2.1M) by 22:46 22:46-23:05 NMR/EPR=42.3/42.2% 23:05-end of shift data taking for Kin5, OUT/270 degree.

    Data Entry by: J.P. Chen