Main INDEX
Monthly INDEX
PREV
NEXT
User name X. Zheng
Log entry time 12:23:46 on September 6,2001
Entry number 73612
keyword=Target - EPR 41% and 1 laser trials
10:51, turn on laser #6 for EPR
10:55, EPR with laser #6, Vmod = 1.1V, RF 16.0V, decrease rel/abs gains by 0.5 turn
did 2 sweeps, P1 = 40.82%, P2 = 41.32%
comments: large error bar
11:00 ,turn on lasers #5 and #7 to pump up
11:17am, 3rd trial, Vmod = 1.0V, RF 16.0V, adjusted gains, did 1 sweep, error bar is smaller, P = 39.51% +/- 1.5%
11:30am, MCC called they are ready to deliver beam;
11:33am, 4th trial, same conditions, but decreased rel.gain by 0.2 turn, error bar became worse, P = 37.5% +/- 2.7%;
11:36am, turn off laser #6, move target to pol 3He cell position, rotate field from 0 to 270 degrees; EPR gains are 0.5/0.2 turn smaller than original setting;
11:40am, field rotation complete, turn on lasers #1, #2 and #4.
Note: polarization here is calculated by assumptions on target temperature, roughly:
lasers..cooling jet..Tpump..Ttarg..deltaNu(Hz)/P..calibration
...3.....OFF.....236.....53....51041.83.....0.9796
...3.....ON.......236.....42....50143.55.....0.9971
...1.....OFF.....190.....53....50103.81.....0.9979
...1.....ON.......190.....42....49262.02.....1.01498
Now using polarization = freq shift(KHz, from fit program) * 1.01498
details on EPR data:
::::::::::::::::
AFP9_6_10_55am-polr1.dat
::::::::::::::
down: freq. shift = -39.09 KHz +/- 2.30 KHz, P = -39.67%+/- 2.34%
up: freq. shift = 41.36 KHz +/- 2.50 KHz, P = 41.98%+/- 2.54%
down: freq. shift = -40.87 KHz +/- 2.93 KHz, P = -41.48%+/- 2.97%
up: freq. shift = 40.54 KHz +/- 2.75 KHz, P = 41.15%+/- 2.79%
::::::::::::::
AFP9_6_11_17am-polr1.dat
::::::::::::::
down: freq. shift = -39.42 KHz +/- 1.44 KHz, P = -40.01%+/- 1.46%
up: freq. shift = 38.44 KHz +/- 1.60 KHz, P = 39.02%+/- 1.63%
::::::::::::::
AFP9_6_11_33am-polr1.dat
::::::::::::::
down: freq. shift = -35.88 KHz +/- 2.69 KHz, P = -36.41%+/- 2.73%
up: freq. shift = 38.01 KHz +/- 2.63 KHz, P = 38.58%+/- 2.67%