• Main INDEX
  • Monthly INDEX
  • PREV
  • NEXT

    User name LeRose

    Log entry time 16:01:48 on September 7,2001

    Entry number 73727

    keyword=Shift Summary

    Day shift: John LeRose, Nilange Liyanage, Yuan Xiao
    8:10 MCC says they're taking beam for 30 minutes to recover RF
    8:16 Beam off
    took the oportunity for a target polarization measurement (see halog#73691)
    8:56 Beam Back on (It was really 30 minutes!)
    Program is production data taking
    Left arm:
    P0=2.27 @ 18.602 deg
    Right arm:
    P0=2.27 @ 18.603 deg
    Ebeam=5727 (set energy) 1/2 wave plate out
    Target 1/2 wave plate out
    target spin 270 deg
    10:55 MCC/Hall C started beam asymmetry tests
    13:45 Hall C finishes beam asymmetry tests
    15:00 stop for target polarization measurement followed by Moller measurement

    run.................start/stop...good e's.....total (this shift)
    3328/31328 7:15/8:13 149k/148k 297k
    3329/31329 8:14/8:20 4k/4k 301k
    3330/31330 8:57/9:53 147k/147k 595k
    3331/31331 9:55/10:50 92k/93k 780k
    3332/31332 10:52/11:47 133k/135k 1048k
    3333/31333 11:48/12:44 144k/144k 1336k
    3334/31334 12:45/13:41 141k/141k 1618k
    3335/31335 13:43/14:39 153k/155k 1926k
    3336/31336 14:40/15:00 46k/46k 2018k