Day: 11/01/2001 Time: 00:00
Owl Shift Starts
Shift Crew: G. M. Urciuoli
Issam Qattan
Run N. of Events Sum_Q 1p1/2 1p3/2
(uA-hours)
***** ********* ********** ******* *********
1405 1.5 3384 440 2022
1406 1.5 3467 422 2069
1407 1.5 3553 348 1889
1408 1.5 3642 404 1638
1409 1.5 3732 291 1514
1410 1.5 3817 197 1126
1411 0.2 3827 22 80
(1) During the 1410 run, the left arm Q1 current did not stay in lock for a while. The problem was fixed by lowering the current manually to 3100.00 uA.
(2) During the 1411 run, beam was turned off at 5:35 AM . We stopped running.
(3) At 6:00 AM, the MCC called to put the fast feedback off (Masked). The beam set energy was = 4620.07 MeV, and Tief Energy was = 4617.93 MeV.
(4) At 7:00 AM, the target was removed.
(5) At 7:30 AM, the target was back on.
(6) At 7:35 AM, the target was removed again.