    User name Issam Qattan

    Log entry time 08:10:00 on November 9,2001

    Entry number 76596

    keyword=Shift summary

    Date: 11/9/01
    Shift: Owl

    (1) Started shift with beam down. Waiting for beam to do Trigger Efficiency.
    (2) At 00:55 AM, MCC called they have fixed the problem and will send tuned beam. We should have beam in about 10 minutes.
    (3) At 1:25 AM, we finally got beam back and continued taking data. First run was 1851 for efficiency.
    (4) Changed the work disk for the jra_det kumac from work3 to work5 (As recommended by Wendy). When we tried to check the detector after we got beam back, the kumac could not find the hbook files. The kumac works fine now.
    (5) At 5:00 AM, MCC called and reported a magnet problem. Beam was back on in 15 minutes.
    (6) At 5:20 AM, beam is back in the Hall. Start running 1866.
    (7) At 5:55 AM, MCC stopped beam to do a QE measurement.
    (8) Beam is back on at 6:00 AM.
    (9) The last run was 1875 at sum_Q= 1185.55 (uA.h)