    Log entry time 08:08:52 on November 11, 2001

    Entry number 76924

    keyword=Beam Time Accounting
    Hall A

    11/11/2001 0000-0800
    Experiment #: e00102
    Shift Leader: Vincent Sulkosky
    Shift Workers: Peter Monaghan

    00000100020003000400050006000700Total Time
    Acceptable Beam
    in Use
    0 0 0 0 0 0 0 0 0
    Beam Available
    but Not in Use
    13.3 0 0 0 0 0 0 1 1.22166666666667
    Beam Not Available
    or Unacceptable
    46.7 1 1 1 1 1 1 0 6.77833333333333
    Accelerator Con-
    figuration Chage
    0 0 0 0 0 0 0 0 0
    Experiment
    Ready
    45 1 1 1 1 1 1 0 6.75
    Planned Config-
    uration Change
    15 0 0 0 0 0 0 0 0.25
    Unplanned
    Experiment Down
    0 0 0 0 0 0 0 11
    Hall not
    ready reasons
    Target 0 0 0 0 0 0 0 0 0
    HRSe 0 0 0 0 0 0 0 0 0
    HRSh 0 0 0 0 0 0 0 0 0
    Data Ac 0 0 0 0 0 0 0 0 0
    Other 0 0 0 0 0 0 0 0 0

    Comments: Due to the water line break, we didn't have beam the entire shift. At 7 AM, the water line was fixed. We have since tired to reset the magnets. The dipoles are reset and the Q1 as well. We need access to reset Q2 and Q3. Mark Stevens is here to reset the magnets.

    Data Entry by: V. Sulkosky