0000 | 0100 | 0200 | 0300 | 0400 | 0500 | 0600 | 0700 | Total Time | |
---|---|---|---|---|---|---|---|---|---|
Acceptable Beam in Use | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
Beam Available but Not in Use | 13.3 | 0 | 0 | 0 | 0 | 0 | 0 | 1 | 1.22166666666667 |
Beam Not Available or Unacceptable | 46.7 | 1 | 1 | 1 | 1 | 1 | 1 | 0 | 6.77833333333333 |
Accelerator Con- figuration Chage | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
Experiment Ready | 45 | 1 | 1 | 1 | 1 | 1 | 1 | 0 | 6.75 |
Planned Config- uration Change | 15 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0.25 |
Unplanned Experiment Down | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 1 | 1 |
Hall not ready reasons | |||||||||
Target | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
HRSe | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
HRSh | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
Data Ac | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
Other | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
Comments: Due to the water line break, we didn't have beam the entire shift. At 7 AM, the water line was fixed. We have since tired to reset the magnets. The dipoles are reset and the Q1 as well. We need access to reset Q2 and Q3. Mark Stevens is here to reset the magnets.
Data Entry by: V. Sulkosky