    Date: 11/11/01
    Shift: Day
    Kinematic: Starting H- (No data taken yet)

    (1) Started shift with no beam and left arm's Quadrupoles out.
    (2) Called Tec on call. I (Issam) Went down to the hall with him. Power supplies for the Q2 and Q3 left arm were down. Turn them on. Recycled Q2 and Q3 by setting them to 1600 uA. We set Po to 4.121 GeV/c.
    (3) It is 10:35AM now and the beam just got back on with I= 60 uA.
    (4) At 2:50 PM, ROC14 failed and we were not able to reboot for a while.
    (5) At the sametime, Detectors Flammable Gas Sensors went off and we were told by the Tec on call to contact Jack Segel. Problem corrected by pushing Alarm Silence.
    (6) We rebooted coda and started all over again. Called Wendy and worked on it together. ROC 14 is not functioning well.
    (7) The last run was 2043 and sum_Q= 211.5.
    (8)Next shift started and we still could not run due to CODA problems.