Shift of wed 11/21, 00h -> 08h
00h05 : shift begins, no beam. A call to MCC learns us that the beam will be on in ~ 20 min.
00h33 : MCC calls to say they will restore current begining with a low value and then increasing to 55 microA
00h50 : run 2618 starts.
03h13 : MCC calls, they have a problem and will stop the beam for a few min. (was during run 2622).
03h25 : EEL calls, there is a problem with the dump. No more explication. Run 2622 ended.
03h45 : beam is on. It seems that I have not understood what EEL was saying.
05h41 : MCC calls : they will make a measurement during 10-12 min.
05h49 : MCC calls : they will turn the beam on.
06h53 : CODA crash during run 2629. no more runs.
07h00 : We take a break for Thanksgiving.
run: events: Q: sumQ:
2617 2.7 22.8 1758.2
2618 2.7 22.8 1781.0
2619 2.7 22.8 1803.8
2620 2.7 22.7 1826.5
2621 2.7 22.7 1849.2
2622 0.4 3.5 1852.7
2623 2.7 22.6 1875.3
2624 2.7 22.6 1897.9
2625 2.7 22.6 1920.5
2626 2.7 22.6 1943.1
2627 JUNK
2628 2.7 22.4 1965.5
2629 CODA crash ; end of runs