• Main INDEX
  • Monthly INDEX
  • PREV
  • NEXT

    User name adaq

    Log entry time 08:01:36 on November 29, 2001

    Entry number 78263

    keyword=Beam Time Accounting
    Hall A

    11/29/2001 0000-0800
    Experiment #: e00102
    Shift Leader: Xiaofeng Zhu
    Shift Workers: Xiaochao Zheng

    00000100020003000400050006000700Total Time
    Acceptable Beam
    in Use
    36.3 50.3 29.5 29.5 3.1 9.2 0 0 2.63166666666667
    Beam Available
    but Not in Use
    0 0 0 30.5 30 0 0 1 2.00833333333333
    Beam Not Available
    or Unacceptable
    23.7 9.7 30.5 0 26.9 50.8 1 0 3.36
    Accelerator Con-
    figuration Chage
    0 0 0 0 0 0 0 0 0
    Experiment
    Ready
    1 1 1 .5 .3 .2 1 1 6
    Planned Config-
    uration Change
    0 0 0 0 0 0 0 0 0
    Unplanned
    Experiment Down
    0 0 0 .5 .7 .8 0 02
    Hall not
    ready reasons
    Target 0 0 0 0 0 0 0 0 0
    HRSe 0 0 0 0 0 0 0 0 0
    HRSh 0 0 0 0 0 0 0 0 0
    Data Ac 0 0 0 0 0 0 0 0 0
    Other 0 0 0 0 0 0 0 0 0

    Comments: 3:35am left arm q1 magnet tripped. 5:03am left arm q1 magnet tripped.

    Data Entry by: Xiaofeng