User name X. Zheng
Log entry time 07:58:32 on December 4,2001
Entry number 78721
keyword=shift summary
continue at kinematics K+;
0:10, beam is back,
1:26, MCC called, will take away beam for 5 minutes. Stop run #2827
1:33, beam is back.
2:11, ROC14 crash, run #2828 end failed; Reboot all components, reset CODA, -> configure -> download..
5:27, MCC called, beam stop for some measurement;
5:31, beam is back, start a trigger eff. run.
5:37, DAQ seems to have problem in communicating with all components, reset CODA -> configure -> download, run #2831 is junk, end of run fail;
5:40, run #2832 is a good trigger eff. run;
6:13, ROC14 crashed, run #2833 has 373K events. reboot all components, kcoda, reset ROC14 from crate, restart runcontrol;
7:00~7:57, beam not stable; run#2834 stopped due to a 8 minutes' beam trip.
7:57, beam off;
time..........run#...events...charge...total Q
0:10~1:26...2827...828K...54.4....154.3
1:33~2:11...2828...310K... 21.0...175.4
2:12~3:51...2829...1.2M....79.0...254.3
3:52~5:27...2830...1.13M..73.9...328.2
5:37~5:41...2832...trigger efficiency
5:42~6:13...2833...373K....24.9...353.1
6:25~7:37...2834...600K....38.7...391.8