    User name Mattias

    Log entry time 16:07:45 on December 5,2001

    Entry number 78773

    keyword=Shift summary

    Shift summary, 12/5/01 08.00-16.00
    M. Andersson, B. Reitz

    08.00 : Shift started while acquiring run 2846.
    09.35 : MCC called to say that they want to try to go to 100uA.
    10.05 : Run 2848 stopped to start new run with 100uA.
    11.20 : MCC called to say that they had to take away the beam because a UPS was down. Run 2849 stopped.
    11:40 : Problem fixed itself and we start acquiring 2850.
    14.10 : K+ kinematics finished. Moving the right spectrometer and changing the momentum.
    14.36 : Started acquiring run 2852 in G_I_+ kinematics.

    K+
    Run# #events Q SQ
    2846 1.5M 101.0 764.7 Bad beam
    2847 Trigger eff.
    2848 1.0M 67.9 832.6
    2849 0.73M 48.1 880.7
    2850 1.5M 101.0 981.8
    2851 1.5M 97.4 1089.1

    G_I_+
    Run# #events Q SQ
    2852 1.5 82 82
    2853 for the next shift