• Main INDEX
  • Monthly INDEX
  • PREV
  • NEXT

    User name Mattias

    Log entry time 00:06:53 on December 9,2001

    Entry number 79130

    keyword=Shift summary

    Shift summary, 12/8/01
    M. Andersson, X. Jiang, K. Fissum

    16.00 : Shift started with run 3001
    19.25 : GI- kinematics finished after 1133.9uAh. Changing the magnet setting in the right arm and moving the right spectrometer to 56.22 deg to do optics etc.
    19.46 : Starting q kinematics, optics, open collimator.
    21.30 : Putting in the sieve slit in left arm.
    22.30 : Making changes to prepare for target thickness calibration.
    23.00 : Starting target thickness calibration
    00.00 : Shift ends while changing target.


    GI- kinematics
    Run# #events Q SQ
    3001 2.7 29.7 955.5
    3002 2.7 29.9 985.4
    3003 2.7 29.7 1015.1
    3004 2.7 29.7 1044.8
    3005 2.7 29.6 1074.4
    3006 2.7 29.8 1104.2
    3007 2.7 29.7 1133.9
    3008 Trig eff

    q kinematics, open coll
    3009 1.5 Trig eff
    3010 2.7 26.7 26.7
    3011 2.7 26.6 53.3
    3012 2.7 26.7 80.0
    3013 2.7 26.7 106.7

    q kinematics, sieve slit
    3014 1.0

    Target thickness calibration, BeO
    3015 JUNK
    3016 JUNK
    3017 28.3