Shift summary, 12/8/01
M. Andersson, X. Jiang, K. Fissum
16.00 : Shift started with run 3001
19.25 : GI- kinematics finished after 1133.9uAh. Changing the magnet setting in the right arm and moving the right spectrometer to 56.22 deg to do optics etc.
19.46 : Starting q kinematics, optics, open collimator.
21.30 : Putting in the sieve slit in left arm.
22.30 : Making changes to prepare for target thickness calibration.
23.00 : Starting target thickness calibration
00.00 : Shift ends while changing target.
GI- kinematics
Run# #events Q SQ
3001 2.7 29.7 955.5
3002 2.7 29.9 985.4
3003 2.7 29.7 1015.1
3004 2.7 29.7 1044.8
3005 2.7 29.6 1074.4
3006 2.7 29.8 1104.2
3007 2.7 29.7 1133.9
3008 Trig eff
q kinematics, open coll
3009 1.5 Trig eff
3010 2.7 26.7 26.7
3011 2.7 26.6 53.3
3012 2.7 26.7 80.0
3013 2.7 26.7 106.7
q kinematics, sieve slit
3014 1.0
Target thickness calibration, BeO
3015 JUNK
3016 JUNK
3017 28.3