    User name R. Michaels

    Log entry time 16:35:18 on January22,2002

    Entry number 80401

    keyword=cabling perturbation (roc15)

    The BPM antenna cables for BPM 4A were removed from the LeCroy ADC on
    ROC15 and put into some spare channels of the ROC2 fastbus ADC in slot 25.
    Purpose is to check if this is a viable future method (so we can get rid of these
    VME crates). There is zero impact on RCS (which uses ROC14), and for R-arm
    DAQ the impact is minimal because they have another copy of these same data.