• Main INDEX
  • Monthly INDEX
  • PREV
  • NEXT

    User name C.Hyde-Wright

    Log entry time 13:41:27 on February 3,2002

    Entry number 81639

    keyword=Status- 24 hours

    Feb 2/ 2002
    20:00 completed Acceptance scan at HRS-L
    4.00 GeV/c
    theta_e = 19.7, 20.232, 20.764, 21.297, 22.361, 22.893, 23.425, 23.958
    50k to 300 k events/run

    Access to Hall. Install Calorimeter at 5A kinematics
    Spectrometer to 14.57 deg 3.5 GeV (electrons) for DVCS test.
    Close hall 21:40

    Beam tuning, FSD problems.
    Feb 3/ 2002

    1 Hr 15 min DVCS test at 1 micro A 4:30 am
    FSD problems after 6:00 am

    MCC correct orbit in injector, FSD trip levels at level 1 recirculation
    repair amplifier on RF separator.

    Beam on 12:10
    1 micro Amp
    12:25 3micro A
    12:40 CODA and VDC problems.