• Main INDEX
  • Monthly INDEX
  • PREV
  • NEXT

    User name adaq

    Log entry time 08:14:21 on February 9, 2002

    Entry number 82351

    keyword=Beam Time Accounting
    Hall A

    2/9/2002 0000-0800
    Experiment #: e99114
    Shift Leader: V. Sulkosky
    Shift Workers: Igor Rachek, Dipangkar Dutta, Eli Piasetzky

    00000100020003000400050006000700Total Time
    Acceptable Beam
    in Use
    42.8 50.6 40 23.9 47.9 55.1 48.8 32.2 5.68833333333333
    Beam Available
    but Not in Use
    16 7 14.8 35 5 0 5 14 1.61333333333333
    Beam Not Available
    or Unacceptable
    1.2 2.4 5.2 1.1 7.1 4.9 6.2 13.8 0.698333333333333
    Accelerator Con-
    figuration Chage
    0 0 0 0 0 0 0 0 0
    Experiment
    Ready
    44 53 40 25 55 1 55 46 6.3
    Planned Config-
    uration Change
    16 0 0 0 0 0 5 9 0.5
    Unplanned
    Experiment Down
    0 7 20 35 5 0 0 51.2
    Hall not
    ready reasons
    Target 0 0 0 0 0 0 0 0 0
    HRSe 0 0 0 0 0 0 0 0 0
    HRSh 0 0 0 0 0 0 0 0 0
    Data Ac 0 7 5 0 5 0 0 0 0.283333333333333
    Other 0 0 15 35 0 0 0 5 0.916666666666667

    Comments: 02:15 Gas alarm went off. Low argon pressure. 02:50 Argon bottle changed out, but VDC's have not recovered. Jack Segal paged . 03:30 Jack reset the main relay switch and the gas flow is coming back up. 07:00 Turn magnet off. Begin Kin 5D(f)

    Data Entry by: V. Sulkosky