    User name Punjabi

    Log entry time 00:06:57 on February10,2002

    Entry number 82442

    keyword=Shift Summary

    Swing Shift

    Shift workers Dimitri Margaziotis, George Chang, Vina Punjabi

    Started the shift in 5De* kinematics.

    16:08 Finished Run 2357. 5De* kinematics.

    16:09 to 16:12 RCS pedestal run 2358.

    16:13 to 16:25 run 2359, LH2 with radiator target. Pedestal suppresed in calorimeter.

    16:31 to 16:43 run 2360, Optics target.

    16:48 to 17:14 run 2361, LH2 no radiator target.

    17:18 to 17:27 run 2362, optics target. Kinematics 5Dg.

    17:28 to 19:58 configuration change to kinematics 5B. Problema with calorimeter High Voltage crate.

    19:58 to 20:15 Run 2363, optics target, knematics 5Bb.

    20:27 to 20:51 Run 2364, LH2 target, no radiator, RCS magnet off, knematics 5Bc.

    20:54 to 21:27 Run 2365, .

    21:42 to 22:31 Run 2367 and 2368, LH2 target, no radiator, RCS magnet on, knematics 5Be+.

    22:40 to 22:54 Run 2369, Empty target with radiator, RCS magnet on, kinematics 5Bf*.

    22:54 Asked for controlled access to check T4 trigger.

    00:07 Bob is still working on trigger T4.