• Main INDEX
  • Monthly INDEX
  • PREV
  • NEXT

    User name Alan Nathan

    Log entry time 13:57:43 on February15,2002

    Entry number 82802

    keyword=calorimeter absorber

    During the maintenance period (i.e., after completion of 5-pass running but before startup of 3-pass running), a 1/2"-thick iron sheet was installed between the calorimeter and the veto, covering the full acceptance of the calorimeter. This corresponds to about 0.70 radiation lengths. This entry will be repeated on the analysis log.