    Log entry time 08:03:09 on February 22, 2002

    Entry number 3512

    keyword=Beam Time Accounting
    Hall A

    2/22/2002 0000-0800
    Experiment #: e99114
    Shift Leader: M. Roedelbronn
    Shift Workers: G. Laveissiere, P. Moussiegt

    00000100020003000400050006000700Total Time
    Acceptable Beam
    in Use
    0 0 20 48 58 51 47 1 4.73333333333333
    Beam Available
    but Not in Use
    1 1 30 9 0 3 0 0 2.7
    Beam Not Available
    or Unacceptable
    0 0 10 3 2 6 13 0 0.566666666666667
    Accelerator Con-
    figuration Chage
    0 0 0 0 0 0 0 0 0
    Experiment
    Ready
    0 0 30 1 1 1 1 1 5.5
    Planned Config-
    uration Change
    0 0 0 0 0 0 0 0 0
    Unplanned
    Experiment Down
    1 1.0 30 0 0 0 0 02.5
    Hall not
    ready reasons
    Target 0 0 0 0 0 0 0 0 0
    HRSe 0 0 0 0 0 0 0 0 0
    HRSh 0 0 0 0 0 0 0 0 0
    Data Ac 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 8
    Other 0 0 0 0 0 0 0 0 0

    Comments: RCS DAQ failure. Using shift to perform Moller, ep measurements. We wanted to try an ARC measurement but neither of the experts responded to our pages. Then, for lack of anything else, we took a lot of optics data. When Ting returns, the plan is to return to Controlled Access until the RCS DAQ problems are fixed.

    Data Entry by: Roedelbronn