    User name Punjabi

    Log entry time 00:00:59 on February26,2002

    Entry number 4263

    keyword=Shift Summary

    Swing Shift.
    Doing kinematics 3Ee

    16:05 to 16:15 Run 3171

    16:15 FPP HV down, 8.1.22
    start run 3172, junk

    3173 also junk reset ROC 14

    start run 3174 at 16:29

    16:29 to 17:52 Run 3174 to 3180

    17:54 FPP HV Tripped. Stopped run 3181. Short run.

    17:57 to 19:22 Run 3182 to 3187

    At the end of run 3182 ROC14 crashed. During run 3186 Calorimeter HV tripped.

    19:22 to 20:27 Run 3188 to 3192. All good runs.

    20:27 to 21:17 Run 3193 to 3197.

    During run 3193 TS2 crashed. During run 3195 RROC14 crashed. During run 3196 ROC4 crashed.

    21:17 to 22:26 Run 3198 to 3202. All good runs.

    22:36 Asked for controlled access to change time window on coincidence.

    Changed calorimeter threshold from 420 MeV to 500 MeV.

    23:05 Beam back at 30 microamp. Started run 3203. Coda crashed. ROC 14. Stopped run 3203. 300 K events.

    Increased current to 40 microamp.

    23:24 Started run 3204. FPP HV tripped. Stopped run 3204. 591 k events.

    23:32 Started run 3205.
    23:47 Stopped run 3205.

    23:48 started run 3206