• Main INDEX
  • Monthly INDEX
  • PREV
  • NEXT

    User name Wendy

    Log entry time 08:09:18 on February27,2002

    Entry number 4453

    keyword=Owl Shift Summary

    00:36 VDC HV seems to be fixed and magnet is back on ready for 40 uA of raster beam.
    01:12 RCS HV crate 4 reset
    TS2 failer ended run #3282
    1:57 Fpp HV (channel 8.1.22) reset
    3:07 RCS HV crate 4 reset
    3:39 FPP HV channel 8.1.22 reset
    5:00 FPP HV channel 8.1.22 reset
    6:00 FPP HV channel 8.1.22 reset
    7:00 FPP HV channel 8.1.22 reset
    7:55 MCC performing QE measurment
    0.84 C for the shift running and
    7.91 C total for the kinematic setting