Log entry time 18:42:46 on March 9,2002
Entry number 1280
keyword=Shift Summary
16:00 started BCM calibration; first did inject then hall, inject then hall to get the hall bcm linearity. Followed by injector (all currents) and hall (all currents) to calibrate the bcms.
18:00 BCM finished. Inserted BeO to check spot location. Target camera does not show up. Moving to 15 cm target
Set raster to 2x2 mm iteratively (it seems x and y maybe swapped between our settings and MCC settings). MCC has it set to 1.5 x 2 mm.
18:45 Analyzed run 4051 (40 uA) to be sure detectors work and target is OK. Everything looks good so we are going to 70 uA, then 100 uA.