Main INDEX
Monthly INDEX
PREV
NEXT
User name johna
Log entry time 08:02:33 on May 2,2002
Entry number 2365
keyword=Shift Summary
No fast feedback, so we are delaying the harp scans and optics studies.
Runs
1109: Long carbon inelastic run (detector checkout)
1110-1113: check rates vs. trigger conditions, event size with FPP on/off.
1114-1119: large collimator, inelastic, various targets
1120-1127: rate-dependence tests (thick carbon, open collimators, vary prescales.)
1128-1129: short runs, one arm only, to check event size for each arm.
1130-1132: BCM calibration runs (1130 did not have zero current points, 1131
ended early due to loss of beam.) Only up to 55 microAmps.
1133: Run to test VDC efficiencies. dhist shows very low raw efficiency, but at
least 70% of events have tracks.
1134-1139: Sieve slit runs.
07:30: Changing spectrometers to 1.958 GeV/c (elastic + 2%).
Issues:
-Event size is >2kB/event. Is this normal?
-Need fast feedback for most of the remaining checkout.
-Need to do the Harp scans that were delayed.
-dhist VDC efficiencies are very low (lower than data indicates - might be
a dhist problem).