• Main INDEX
  • Monthly INDEX
  • PREV
  • NEXT

    User name Brash

    Log entry time 00:01:02 on May12,2002

    Entry number 3266

    keyword=Shift Summary

    16:00 Starting shift at E=3.362 GeV, LQ2=3.20 RQ2=0.5 "KING", LH2 target
    16:05 End Run 1484
    16:05 Start Run 1485
    16:33 End Run 1485 - End of LH2 running - total 331k Left protons in elastic peak
    Move to thin carbon target for pointing runs
    16:40 Start Run 1486 - Raster On
    16:47 Stop Run 1486
    16:50 Start Run 1487 - Raster Off
    17:00 Stop Run 1487

    Change kinematics to LQ2=4.1 - KINH

    17:23 Start Run 1488 - Raster Off
    17:32 Stop Run 1488
    17:35 Start Run 1489 - Raster On
    17:40 End Run 1489

    Noticed Beam Spot was off (about 0.3mm in X). Called MCC to retune. They did a good job !! Repeat pointing runs

    17:45 Start Run 1490 - Raster On
    17.52 Stop Run 1490
    17:53 Start Run 1491 - Raster Off
    18:05 Stop Run 1491

    Change to LH2 Target

    18:15 Start Run 1492
    18:26 Stop Run 1492
    18:26 Start Run 1493
    18:36 Stop Run 1493
    18:36 Start Run 1494
    19:14 Stop Run 1494
    19:15 Start Run 1495
    19:53 Stop Run 1495
    19:55 Start Run 1495
    19:55 Start Run 1496
    20:35 Stop Run 1496
    20:35 Start Run 1497
    21:11 Stop Run 1497 - ended a bit early - beam off with RF troubles.

    Beam back after 12 minutes.
    21:21 Start Run 1498
    21:23 Beam off - RF trips
    21:30 Beam back
    22:00 End Run 1498
    22:00 Start Run 1499
    22:23 Stop Run 1499 - Beam off

    22:30 MCC called to say that the "box power supplies" needed to be reset, and this apparently requires calling in someone to do it. Bottom line: no beam for two hours.
    22:55 start run 1500, MCC solved their problem