    User name perdrisat

    Log entry time 16:06:07 on May13,2002

    Entry number 3385

    keyword=day shift, May 13, 2002

    8:12 power glitch, requires target reboot, ROC14 reboot; machine off.
    9.00 beam taken off to repair vacuum trips; lasted till 9:17
    10:27 ROC 14 failure (in run 1546)
    15:20 change to dummy cm
    15:30 start data on dummy, run 1551
    14:15 power glitch, reboot target; was in hall, target rack went black.
    declared 6.7 hrs ABU
    15:18 beam off, change target back to 4 cm LH2
    15:25 beam back on, start run 1553
    16:00 end of shift