• Main INDEX
  • Monthly INDEX
  • PREV
  • NEXT

    User name gaskell

    Log entry time 09:52:00 on May17,2002

    Entry number 3479

    keyword=spot size too small?

    Since the beam size was not logged after the harp scan last night we re-analyzed what we think is the last harp scan file (1674). The results are H=59 um and V=74 um. This is too small. We want about H=200, V=75 to reduce boiling effects. When beam comes back, we should do another harp scan to see what the size is, and if it is too small, ask MCC to blow up the beam.