Main INDEX
Monthly INDEX
PREV
NEXT
User name gaskell
Log entry time 09:52:00 on May17,2002
Entry number 3479
keyword=spot size too small?
Since the beam size was not logged after the harp scan last night we re-analyzed what we think is the last harp scan file (1674). The results are H=59 um and V=74 um. This is too small. We want about H=200, V=75 to reduce boiling effects. When beam comes back, we should do another harp scan to see what the size is, and if it is too small, ask MCC to blow up the beam.