• Main INDEX
  • Monthly INDEX
  • PREV
  • NEXT

    User name adaq

    Log entry time 07:18:08 on May 22, 2002

    Entry number 3918

    keyword=Beam Time Accounting
    Hall A

    5/22/2002 0000-0800
    Experiment #: e01001
    Shift Leader: A. Sarty
    Shift Workers: S. Frullani, I. Qattan

    00000100020003000400050006000700Total Time
    Acceptable Beam
    in Use
    0 0 0 0 0 0 10 10 0.333333333333333
    Beam Available
    but Not in Use
    0 0 0 0 0 0 0 0 0
    Beam Not Available
    or Unacceptable
    60 60 60 60 60 60 50 50 7.66666666666667
    Accelerator Con-
    figuration Chage
    0 0 0 0 0 0 0 0 0
    Experiment
    Ready
    60 60 60 0 0 45 45 10 4.66666666666667
    Planned Config-
    uration Change
    0 0 0 0 0 0 0 50 0.833333333333333
    Unplanned
    Experiment Down
    0 0 0 60 60 15 15 02.5
    Hall not
    ready reasons
    Target 0 0 0 0 0 0 0 0 0
    HRSe 0 0 0 0 0 15 0 0 0.25
    HRSh 0 0 0 0 0 0 0 0 0
    Data Ac 0 0 0 0 0 0 0 0 0
    Other 0 0 0 60 60 0 0 0 2

    Comments: Problems getting raster set. This leads to resetting an IOC that interfers with cryolevel controls, that leads to right spectrometer magnets tripping. Get cryolevels, and magnets restored, but never get raster fixed. Will be fixed first thing on morning shift. Use end of shift to do BCM linearity check (i.e. calibration).

    Data Entry by: sarty