1600 | 1700 | 1800 | 1900 | 2000 | 2100 | 2200 | 2300 | Total Time | |
---|---|---|---|---|---|---|---|---|---|
Acceptable Beam in Use | 52 | 56 | 60 | 30 | 0 | 0 | 0 | 0 | 3.3 |
Beam Available but Not in Use | 8 | 4 | 0 | 0 | 0 | 0 | 0 | 0 | 0.2 |
Beam Not Available or Unacceptable | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
Accelerator Con- figuration Chage | 0 | 0 | 0 | 30 | 1 | 1 | 1 | 1 | 4.5 |
Experiment Ready | 52 | 60 | 60 | 30 | 30 | 60 | 60 | 60 | 6.86666666666667 |
Planned Config- uration Change | 8 | 0 | 0 | 30 | 30 | 0 | 0 | 0 | 1.13333333333333 |
Unplanned Experiment Down | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
Hall not ready reasons | |||||||||
Target | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
HRSe | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
HRSh | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
Data Ac | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
Other | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
Comments: 4: 00 Doing dummy target 4:45 Switch to 12C pointing at 70uA 5:05 Switch to 4cm Lh2 5:45 during run 1784 fixed downstream beam v-to-f cables.
Data Entry by: M Jones