0800 | 0900 | 1000 | 1100 | 1200 | 1300 | 1400 | 1500 | Total Time | |
---|---|---|---|---|---|---|---|---|---|
Acceptable Beam in Use | .5 | .7 | .9 | .5 | 0 | 0 | 0 | 0 | 2.6 |
Beam Available but Not in Use | .5 | .3 | .1 | .3 | 0 | 0 | 0 | 0 | 1.2 |
Beam Not Available or Unacceptable | 0 | 0 | 0 | .2 | 1 | 1 | 1 | 1 | 4.2 |
Accelerator Con- figuration Chage | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
Experiment Ready | .5 | .7 | .9 | .7 | 1 | 1 | 1 | .8 | 6.6 |
Planned Config- uration Change | .5 | .3 | 0 | .3 | 0 | 0 | 0 | 0 | 1.1 |
Unplanned Experiment Down | 0 | 0 | .1 | 0 | 0 | 0 | 0 | .2 | 0.3 |
Hall not ready reasons | |||||||||
Target | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
HRSe | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
HRSh | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
Data Ac | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
Other | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
Comments: Smooth begining of the shift. Then ran into injector problems.
Data Entry by: S. Kox