    User name Ulmer

    Log entry time 16:28:20 on June17,2002

    Entry number 86291

    This entry is a followup to: 86276

    Followups:

    keyword=Remeasure Q2D_f00

    Remeasurement of various Q2D_f00 points
    ---------------------------------------------------------

    Kinematics: Q2D_f00

    LEFT: AS IT IS (DO NOT CHANGE MOMENTUM OR ANGLE!!)
    RIGHT: Set to 1.8339 GeV/c (cycle Q2/Q3), 42.72 deg

    Run Trigsetup for these kinematics.

    Execute the following sequence of measurements.

    Target Coll-L Coll-R Time PS1/2/3/4/5 Current

    9-foil C OPEN OPEN 5 min 5/140/10/4/65535 100 uA
    15cm LH2 Sieve OPEN 60 min 23/520/4/9/1 100 uA
    15cm LH2 OPEN OPEN 15 min 25/520/75/16/1 100 uA
    15cm LD2 OPEN OPEN 20 min 13/340/36/9/1 100 uA

    TOTAL 100 min


    Note: the above prescale factors and times are based on the already
    measured points at 100 uA beam current.