New crew on shift : Kent Paschke, Michael Roedelbronn, Eric Voutier, Eli Piasetzky
****************
0:00 Continue data taking at kinematics Q2_g10
1:30 ROC14 crash
1:35 Back in business
1:45 ROC14 crash / Move the optics target for pointing
1:50 Back in business
2:05 Change to next kinematics
->> Some minor problems
The pointing run at Q2_g10 was not stopped and was still taking data while moving
the right spectrometer. Pointing analysis should stop at 200 k events from which we
decided to stop the run and move to Q2_g20.
While changing kinematics I (Eric) mistakenly move the left spectrometer instead
of the right, for a few 0.10 degres. I came back to the position we had before taking
advantage of the floor-plates of the Rosenbluth experiment. We should be back to
the same position: there should be no influence of data taking since the constant left
arm is used here for luminosity monitoring only; pointing for this position will be
done along with all the remaining successive "g" kinematics.
2:20 Back in business
2:30 Change to 15 cm LD2 target
2:40 Back in business
3:37 DAQ problems / kcoda
3:39 Back in business
5:34 DAQ Problems / ROC3 + ....
5:44 Back in business
5:50 Move to kinematics Q2_g40
6:15 Back in business
6:22 Move to 15cm LD2 target
6:35 Back in business
7:09 ROC14 crash
7:14 Back in business
7:45 ROC14 crash
7:52 Back in business
Run History
--------
>- Q2_g10 -<
1669 .......... Production run / good run
1670 .......... Production run / good run
1671 .......... Production run / good run
1672 .......... Production run / ROC14 crash
1673 .......... Production run / short run
1674 .......... Efficiency run / ROC14 crash
1675 .......... Pointing run / junk after 200k event
>- Q2_g20 -<
1676 .......... Pointing run
1677 .......... Production run / DAQ problems at the end
1678 .......... Production run / good run
1679 .......... Production run / good run
1680 .......... junk
1681 .......... junk
1682 .......... junk
1683 .......... Efficiency run
>- Q2_g40 -<
1684 .......... Pointing run
1685 .......... Production run / ROC14 crash
1686 .......... Production run / ROC14 crash
1687 .......... goes to next shift