00:00 MCC still working on the machine
01:00 Q1 Tripped and was reset
02:15 MCC cannot deliver more than 8 uA. Optics is being called in.
03:40 Good beam to Hall A (100 uA, fast feedback on, position 1H04B -0.1:0.0
target OTR looks good) 1H04A is a bit off, but MCC was unable to fix it.
Kinematics Q2_jkN file 1814 (high prescales) 15cm LD
file 1815
4:05 Went to change kinematics and spectrometer bogie control failed.
Gary arrived, a controlled access was made, and the problem fixed.
5:40 Started taking physics beam again
Kinematic Q2_k40 file 1816 Optics Target
file 1817 15cm LD Target 1M events
file 1818 15cm LD Target 0.9 M events
7:55 North Linac just dropped to power permit.