    Log entry time 00:09:17 on October 6, 2002

    Entry number 87404

    keyword=Beam Time Accounting
    Hall A

    10/5/2002 1600-2400
    Experiment #: e00007
    Shift Leader: A. Deur
    Shift Workers: K. Wang, I. Kattan

    16001700180019002000210022002300Total Time
    Acceptable Beam
    in Use
    53 18 0 0 0 0 39 42 2.53333333333333
    Beam Available
    but Not in Use
    0 37 0 15 18 9 0 0 1.31666666666667
    Beam Not Available
    or Unacceptable
    7 5 1 45 42 51 21 18 4.15
    Accelerator Con-
    figuration Chage
    0 0 0 0 0 0 0 0 0
    Experiment
    Ready
    1 23 1 45 42 51 1 1 6.68333333333333
    Planned Config-
    uration Change
    0 37 0 0 0 0 0 0 0.616666666666667
    Unplanned
    Experiment Down
    0 0 0 15 18 9 0 00.7
    Hall not
    ready reasons

    Comments: 16:51 Done data taking for FPP straight through. Start data taking for c12 target alignment study. 17:18 Controled access (push the FPP doors back in and fixed Q1 right arm) 17:55 back to beam permit 19:35 Finish tuning thru the compton chicane. We go in controled access because quadrupole Q1 on right HRS tripped again. 19:50 Q1 fixed. Back to beam permit. 20:42. Beam is back but the optic target is still causing beam trips (from the beam dump ion chambers) 21:52 We give up for now the c12 optic data and go to LH2 Problem with the eP ion chamber (beam trips). MCC retuned the beam 22:21 beam available for physics data taking. 23:03 Beam trip. Need to retune the beam. 23:45. Beam is back

    Data Entry by: A. Deur