1600 | 1700 | 1800 | 1900 | 2000 | 2100 | 2200 | 2300 | Total Time | |
---|---|---|---|---|---|---|---|---|---|
Acceptable Beam in Use | 53 | 18 | 0 | 0 | 0 | 0 | 39 | 42 | 2.53333333333333 |
Beam Available but Not in Use | 0 | 37 | 0 | 15 | 18 | 9 | 0 | 0 | 1.31666666666667 |
Beam Not Available or Unacceptable | 7 | 5 | 1 | 45 | 42 | 51 | 21 | 18 | 4.15 |
Accelerator Con- figuration Chage | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
Experiment Ready | 1 | 23 | 1 | 45 | 42 | 51 | 1 | 1 | 6.68333333333333 |
Planned Config- uration Change | 0 | 37 | 0 | 0 | 0 | 0 | 0 | 0 | 0.616666666666667 |
Unplanned Experiment Down | 0 | 0 | 0 | 15 | 18 | 9 | 0 | 0 | 0.7 |
Hall not ready reasons |
Comments: 16:51 Done data taking for FPP straight through. Start data taking for c12 target alignment study. 17:18 Controled access (push the FPP doors back in and fixed Q1 right arm) 17:55 back to beam permit 19:35 Finish tuning thru the compton chicane. We go in controled access because quadrupole Q1 on right HRS tripped again. 19:50 Q1 fixed. Back to beam permit. 20:42. Beam is back but the optic target is still causing beam trips (from the beam dump ion chambers) 21:52 We give up for now the c12 optic data and go to LH2 Problem with the eP ion chamber (beam trips). MCC retuned the beam 22:21 beam available for physics data taking. 23:03 Beam trip. Need to retune the beam. 23:45. Beam is back
Data Entry by: A. Deur