• Main INDEX
  • Monthly INDEX
  • PREV
  • NEXT

    User name adaq

    Log entry time 00:01:51 on October 7, 2002

    Entry number 87520

    keyword=Beam Time Accounting
    Hall A

    10/6/2002 1600-2400
    Experiment #: e00007
    Shift Leader: A. Deur
    Shift Workers: R. de Leo, I. Qattan

    16001700180019002000210022002300Total Time
    Acceptable Beam
    in Use
    44 33 1 58 1 6 50 26 5.61666666666667
    Beam Available
    but Not in Use
    16 12 0 2 0 52 10 32 2.06666666666667
    Beam Not Available
    or Unacceptable
    0 15 0 0 0 2 0 2 0.316666666666667
    Accelerator Con-
    figuration Chage
    0 0 0 0 0 0 0 0 0
    Experiment
    Ready
    44 48 1 1 1 8 50 28 5.96666666666667
    Planned Config-
    uration Change
    0 0 0 0 0 52 0 0 0.866666666666667
    Unplanned
    Experiment Down
    16 12 0 0 0 0 10 321.16666666666667
    Hall not
    ready reasons

    Comments: 16:44 Quadrupoles 1 for right and left HRS tripped. Asked MCC for an access 17:10: Q1s fixed 17:27 beam back. 21:00 Done with kinematics ep4-3. New kinematics: HRS left is now at 1.687 GeV/c HRS right is now at 3.064 GeV (Q2 and Q3 cycled) We moved left HRS to 43.604 We moved right HRS to 22.318 We opened the 1.5" and 3" FPP carbon doors 21:54. Beam back (20 uA). 22:50 quadrupoles Q1 or left and right HRS tripped. Need controled access to reset them. 23:34. Beam back.

    Data Entry by: A. Deur